The bridge was scheduled to open in the fall of 2012, however, that never happened. For some reason, the fences never came down. Currently, a locked gate prevents people from using the bridge, whose construction has been finished for approximately four months now.
I don't know what is going on with the bridge, but I am sure that the residents of North Phoenix would appreciate a safe way to cross the freeway while they are out for a jog or a ride.
I want to know: what's the deal? How come the bridge is done and not open?
No comments:
Post a Comment