
The 14-mile segment consists of a four-lane divided roadway which connects Interstate 17 to Lake Pleasant Parkway before continuing on into Peoria and the West Valley.
The new stretch of the Loop 303 freeway will allow travelers headed into town from Northern Arizona to bypass the heavier traffic of Phoenix and get to the West Valley including Peoria, Surprise, and Waddell before connecting to Goodyear. This should also help reduce traffic on the Loop 101 Agua Fria Freeway as well.

ADOT officials say the Loop 303 should connect to Interstate 10 in Goodyear by 2015, with another interchange planned at US 60 sometime between 2016 and 2025.
For more information and updates about construction on the Loop 303 freeway, please visit the Arizona Department of Transportation at www.azdot.gov.
2 comments:
Is the Pyramid Peak interchange still on schedule for summer of 2012?
Does anyone know the status of the pyramid peak interchange?
Post a Comment